AIXTRON CVD INSTALLATION

Graphenemex is completing the installation of the latest state-of-the-art graphene production equipment in its facilities located in Mexico City. The AIXTRON CVD system will enable the deposition of graphene and carbon nanotubes on 6-inch substrates. The equipment is expected to start operations during February of 2017 and to strengthen our position as the Mexican and Latin American leading producer of Graphene.

No comments yet.

Leave a Comment